How to direct the lamp or pour from the LED strip
It is used for LED lighting and is economical, practical and attractive to send at home and is light and convenient. Light up a lot of predominance before lighting up with a litter box. Dory is a neophyte maystor can send the water from the LED strip so you own it, you can bet on the purchase of the completed construction.
Containment: 1. Tova, from some things we need for work 2. How to choose LED strip 3. Parvi stupki-stupka according to stupka instructions for production 4. How to convert a fluorescent lamp to LED 5. How to change the LED strip in the completed poly
Tova, from some things we need for work
Before you start and edit the LED strip, shake it up and determine the design, size, shape. Estimate what materials are needed and how many and prepare the tools needed. For all the design chosen for the lighting of the body, it is determined more vibrating:
- gyvkava daska sjs leds;
- save the block for a voltage of 12 volts, for some reason I use LED strips for a voltage of 24 volts or higher, but there are rare designs;
- poyanik with colophon and kalay;
- scissors;
- insulating tape.
Attention! Use jelly when soldering LED tape is not allowed, this kind of jelly bet can damage the conductor and inject more destruction when used again.
Whenever you choose a supporting structure and its shape, do not forget that such a board with LEDs can be installed somehow on an equal, and on a twisted surface.It is necessary to ensure that such a support surface and sifting toplinate is effective, so the LEDs and do not overheat.
How to choose LED strip
Based on LED tape and plastic tape, some LEDs and resistors are placed at the top. Various diodes can be mounted on it, for example SMD 3528 or SMD 5050. The number in the marking shows the technical size. With an increase in size, the brightness and power are increased. Pomiselete - kolkoto on-golyama e flatness on the LED, more sensibly brighter than the ribbon tape.

Marker on the tape depending on the size on the LED
LED strips vary in degrees of protection:
- IP33 - silicone-free protective layer;
- IP44 - dust and moisture resistant;
- IP65 - in addition, it protects against dust and moisture, which guarantees high elasticity at low temperatures;
- IP67 - for protection from the health of silicone pipe;
- IP68 - protection capacitance is directed against a two-layer pipe with a special filler.
Devices with protection IP67 and IP68 are suitable for pool lighting and various tanks.
Osventova, when you choose a ribbon, turn your attention to the colors for the radiance, the broya for the bloom and the scatter for the radiance.
Calculated for the power per LED polylay by area per room
Order and count LED fields, then determine the needs for your flock of light stream, which is measured in the lumen. For yes, send tov, tryabva and multiply the degree by the light (you can measure the cost for distinguishing the rooms in the table by the floor), the area per room, measured in square meters, and the coefficient per height per tavana.
Table 1
flock type
Degree on illuminance, lx
flock type
Degree on illuminance, lx
Main office 300Kitchen and hall 150Office, some of the drawings are distorted500Deca200Conference room200Bathroom, shower room50Steelyard50–100cloakroom75Corridor, hall50–75Library and study room300Archives room75Stalbi in residential premises20Warehouse and auxiliary premises 50Pluven pool, sauna100
Table 2
Visocina on tavana, m
Coefficient
2,5… 2,7
1
2,7… 3
1,2
3… 3,5
1,5
3,5… 4
2
Poznavayki svetlinniya stream for clarification to the room, it was created from a single meter gavkava board (usually given in the technical specifications), you can correctly determine the length of the ribbon. For yes, send tov, divide the necessary amount of light by the amount of light, removed from one meter from the guvkavat duska.
Calculation example:
Let’s define a few meters of tape and prepare for lighting on the hall from an area of 20 square meters from a height to a tavana of 2.7 meters. Svetlinen stream 720 lm / m.
Let's calculate the need for a light stream:
E = x * Y * Z = 150 * 20 * 1.2 = 3600 lm,
K'deto x - norm for illumination, for cold e 150,
Y - area per flock,
Z - coefficient depending on the height of the tavana 1.2.
Required length for ribbon:
L \u003d 3600 / 1.2 \u003d 5 m.
This means that 5 meters of LED strip is necessary for lighting on the basin.
Selection for storage unit by capacity
Kolkoto is powerfully stored for LED lamps, sensible in a smart way. For yes, don’t cloak additionally, just tryabva and determine the minimum amount of sufficient power, the consumer from the light source.
For yes, count, tryabva, yes, you know, it’s a meter (usually manufacturers will list the values in the technical specifications) and the price for a dskata.Multiply the value by these two values and multiply the value obtained from the coefficient for safety, which is 1.5, obtaining the necessary goods for storage. Determining the electrical merchandise on a meter tape, for which we know which LEDs are used and put on a single meter, a spread table:

Table for the definition on the natovarvaneto, created from the ribbon
Calculation example:
Tape is 5 meters long, natovarvane is 14.4 W / m. Determine the minimum amount of sufficient power for storage.
For yes, let's analyze the natovarvaneto for the zahranvaneto, multiplying the consumer's power from one meter from the gavkavat of the duska to the neinat of the length and the coefficient for safety:
Rb \u003d Rl * Ll * K \u003d 14.4 * 5 * 1.5 \u003d 108 W.
The capacity for purchases is to protect the block treabva and be nai - close to the temple. For example, in our example, you can save 120W.

Marking for storage back kjm sdzharzhanieto ↑
Parvi stupki-stupka according to stupka instructions for production
Once the design is installed, it is aimed at the base on the gavkava daska sjs LEDs, have foreseen the following characteristics:
- it’s safe to tryabva, even if it’s possible, close to the ribbon, for yes, avoid ruining the brightness for the sake of solidity for the connection of the conductor;
- as a construct, to which a light-colored tape is attached, e from metal, togava vrazkite tryabva and be isolated from the base, for all avoid joining.
Design on LED polylay from darvo
For yes, direct the lighting rod from the light strip with the LEDs, and then follow the materials:
- two boards 100 × 20, 1500 each;
- four bars 40x20 mm, length 1600 mm;
- 8 self-tapping screws with a diameter of 3.5 mm and 16 with a diameter of 2.5 mm, length 40 mm;
- 8 dorschitelni pironi with a length of 20 mm;
- matirano glass with dimensions 700 x 700 mm;
- half screw - 8 bolts;
- gvkava tabla for clarification and preservation of the stone.
Osventova, for yes, protect the waters from the devil, you must follow the tools: a hacksaw, an electric drill, a set of screwdrivers, a drill and a drill with a diameter of 4 mm.
Instructions for the production of mortar by mortar:
- Cut off two parchettes with a length of 705 mm from a board 100 × 20 with a hacksaw. From the friend - two rods with a length of 745 mm.
- Save the kutiyata. Checking the size of the kutiyata, toy tryabva yes bde 705 by 705 mm.
- Cut off two parchettes with a length of 845 mm each from a board 100 × 20. Draw two marking lines at a distance of 40 and 80 millimeters from the fish to the skat. We correct the packaging at the top of the tyah for a length of 10 mm and remove the darvoto between the tie from the summer. Imame blanks for vrazka from half a darvo.
- Sibirame ramata and I put kutiyata on top. We have received a design with two self-tapping screws from every country.
- Measuring the last size on the frame;

Vtreshni size for darvenata kashta
- spored get the size and rule two strands and gi svyarzvame in the center in half a darvo;
- installer received the structure;
- nii zakovavame decorative ggli on golyam kutia;

Install decorative corners
- discard the resulting structure and install matirano glass; nie go fixirame with bus, some montirame on Wednesday on kutiyata; footprint of kato montiramé protected and LED tape;

Install matirano glass, storage and LED strip
- put hanging cookies;
- attach cookies to kam tavana;

Montirane on okacheni kuki kum tavana
- montiram polyleya kjm tavana;
- boyadiswame darveni parts from the construct;
- connection of the polyley to the electric grid and its inclusion.
More ideas for home cooking
Ima still have a lot of ideas how to direct the lamp with LED strip. For example, you can direct the polyleywith the help of an old frame from a fluorescent lighting body. For work on the frame, a suitable and metal profile is used. Source for lighting with LED, montirane for pumping tavan along the perimeter, the look is beautiful.

Use on LED strip on tavan back kjm sdzharzhanieto ↑
How to convert a fluorescent lamp to LED
For the forest, yes, point the lamp at the LED strip from the fluorescent polyls. For tova vi tryabva:
- skip fluorescent lamps, starters, throttles and other unnecessary elements from the lamp;
- cut the lighting tape along the length of the lighting rod;
- close up, get the segments of the beam on the lighting beam;
- solder lazily stubbornly one on the other, cato spazvate polarity;
- save it.
Somehow you can see, forestry and remodeling of polyols or lamps own your own. Nyakolko example for such work sa testimony on the floor.

Mounting on LED strip vvv fluorescent lamp
LED strip in table lamp back kjm sdzharzhanieto ↑
How to change the LED strip in the completed poly
Ima has two reasons, for the sake of which the polileyat e hid it and shine: either it was preserved, or it burned out the scarf. For yes, you can assure that it is working correctly, try and measure the voltage for damage to the output: like 12 V, the value is in the state of all maintenance, and the cause for damage is in the tape itself.
Nay-golyamata difficulty when crushed on the LED strip is chosen for a new color and power. That's right, change it beforehand, try carefully and choose eat or similar according to the technical characteristics.
I will change the tape in the next edition:
- dismantled on old polyley;
- dismantle the damaged tape;
- zalepete a new bright ribbon on her locality.
Tova e vsichko is necessary, for yes, remontir fittings.
PreviousPolyley How yes send polyley for the children's flockNextPolyleiIzbor for tavanni lampi and polylei in Art Nouveau style for the kitchen









